EDS Engineering, EDS Engineering
[https://eds-engineering.com/en/] Directions Electrical substations Cable lines Industrial solar power station SPP for your personal needs ETL-laboratory Service SES Turnkey solutions Projects Press center News Press kit Contacts About the company Reviews Catalogs and reference sheets Career Jobs Contacts HOLDING +38 073 477 61-21 Ua / En Ua / En Directions Electrical substations Cable lines Industrial solar power station SPP for your personal needs ETL-laboratory Service SES Projects Сonstruction of substation 35/10 KW «Teplichnaya» Reconstruction of electrical substations ST «Topol» 150/10 kV Reconstruction of 35/10 kW substation «Yaduty» Reconstruction of 35/10 kW substation «Patyuty» Reconstruction of the cable line Frunzenskiy housing estate Reconstruction of electrical substations 35/10 kW «Holovenky» All projects Company Contacts Press center HOLDING Press center News Press kit Electrical substation Construction and reconstruction of substations of all voltage classes. EDS-Engineering has all the necessary permissions to carry out design, construction, commissioning, and commissioning of electrical substations with voltage classes from 10 to 330 kV. More Cable lines Connection to networks and documentation services at all stages EDS-Engineering specialists use modern methods that allow cable laying in trenches, tunnels, channels, and ducts. More Industrial solar power station A full cycle of construction of industrial solar power stations EDS-Engineering has been building solar power stations of any complexity. A professional approach to the construction of a power station will ensure the rapid construction and launch of a solar power station, including a high-powered one. More SPP for your personal needs Construction of solar power plants for your personal needs for business More Electrical substations Cable lines Industrial solar power station SPP for your personal needs Advantage Over 10 years of experience in the construction of solar power stations and substations 2 500 projects in the field of electricity and energy 3000 units switchboard equipment under the trademark of EDS 500 company professionals of the company, including temporarily attracted to objects 1st place in the rating of designers of SPS according to the GetMarket investment platform More than 900 MW The total capacity of the designed SPS More than 220 MW photovoltaic capacities were built “from scratch” throughout Ukraine 4th place in the rating of general contractors of SPS according to the GetMarket investment platform EDS Engineering projects All projects PS construction The project is being built Construction of substation 330/35 kV "Nadezhdino" The substation will provide power supply to the future Zaporizhzhya wind farm with a capacity of 500 MW, which promises to become the largest in Ukraine. More PS construction The project is completed Reconstruction of electrical substations 150/35/10/3,3 kW «Fedorovka» A set of works on the installation of equipment and specialized software (SCADA system) was completed, which provide the ability to receive and transmit information from the substation (SS) to the control center. More Power Supply and Automation The project is completed THE POWER SUPPLY OF LCD PIXEL Provide supply facility switchboards 0,4 kV individual performance on a qualitative high-voltage equipment Eaton, including one of our flagship sales main switchboard 400A StreamLine. More The project is completed Reconstruction of the cable line «Lider» The length of the route : 2151 m More Cable Lines The project is being built Installation of cable lines for wind farm "Sivash" 150 km of cable lines; 500 km of cable of XLPE; 170 km of fiber-optic communication lines of a high degree of protection. More The project is being built Construction of substation 330/35 kV "Nadezhdino" PS construction The project is completed Reconstruction of electrical substations 150/35/10/3,3 kW «Fedorovka» PS construction The project is completed THE POWER SUPPLY OF LCD PIXEL Power Supply and Automation The project is completed Reconstruction of the cable line «Lider» The project is being built Installation of cable lines for wind farm "Sivash" Cable Lines All projects Projects on the map eds Engineering Objects All objects SP ES Cable line label_connect In the process of implementation Completed Read more Latest news All the news 06/12/2024 💙💛 Congratulations on the Day of the Armed Forces of Ukraine! 💙💛 Congratulations on the Day of the Armed Forces of Ukraine! The Armed Forces are a strong shield and a striking sword ... About Company 29/11/2024 Efficient Energy Solutions: 35 kV Substations by EDS Black Friday! Who needs a substation? 🔋 Looking for a fast and reliable solution for 35 kV electrical substations? We ha... About Company 27/11/2024 🔋 Revolution in Ukraine’s Energy Sector: Energy Storage Systems by #EDS_Project 🔋 A new trend in Ukraine's energy sector is energy storage facilities (ESP).The #EDS_Project is actively working on the ... About Company 22/11/2024 Q-360: Modular Charging Station of the Future for Electric Vehicles 🔧 A look inside the Q-360 charging station The Q-360 charging station is a combination of technology, modularity and tho... About Company 13/11/2024 Comprehensive Approach and Rapid Solutions by EDS-Project for 10 MW Solar Power Plant Construction 🔆 10 MW solar power plant: An integrated approach and quick solutions from EDS-Project When working on such large-scale... About Company 31/10/2024 Teamwork: Excursion to the main water supply system Recently, the #EDS_Ukraine team organized a tour of one of the largest projects - the Main Water Supply System. This eve... About Company 16/10/2024 Smart Grid for the future: innovative solutions in action ⚡️ We are implementing advanced solutions for the creation of Smart Grid systems with the #EDS_Substation and #dniprotec... About Company 14/10/2024 EDS Ukraine Showcases the Ultra-Fast EDS-Q360 Charging Station at MSV 2024 in Brno #EDS_Ukraine on the international stage! We took part in the leading international exhibition of industrial technologies... About Company 04/10/2024 Start of construction of a new 10 MW solar power plant! 🔆 We are starting the construction of a new facility - a 10 MW solar power plant! Today we want to show you the same “st... About Company 01/10/2024 Happy Day of the Cossacks, defenders of Ukraine! 💪Happy Day of the Cossacks, defenders of Ukraine!Today we honor those who stand guard over our independence, who risk th... About Company All the news Directions Electrical substations Cable lines Industrial solar power station Construction of solar power plants for your personal needs for business ETL-laboratory Service SES Projects Reconstruction of electrical substations 150/35/10/3,3 kW «Fedorovka» Reconstruction of the cable line «Lider» THE POWER SUPPLY OF LCD PIXEL Construction of substation 330/35 kV "Nadezhdino" Installation of cable lines for wind farm "Sivash" Company Contacts Press center Contacts ul Verkhoyanskaya 49 Dnipro, Ukraine, 49049 +38 073 477 61-21 e-mail: info@eds-ltd.com.ua Press center News Press kit Up © 2010-2024 EDS Engineering Consent to the processing of personal data Privacy policy