Below is the text of the page https://eds-engineering.com/en/ stored 2021-02-26 by archive.org.ua. The original page over time could change. View as original html

EDS Engineering, EDS Engineering

[https://eds-engineering.com/en/] About the company Directions Electrical substations Cable lines Electricity and network connection Industrial solar power station Specialized services Projects News Contacts HOLDING +38 056 731-95-75 Ua / Ru / En Ua / Ru / En Directions Electrical substations Cable lines Electricity and network connection Industrial solar power station Specialized services Projects THE SUPPLY OF FEODOSIA POP Сonstruction of substation 35/10 KW «Teplichnaya» Reconstruction of electrical substations ST «Topol» 150/10 kV Reconstruction of 35/10 kW substation «Yaduty» Reconstruction of 35/10 kW substation «Patyuty» Reconstruction of the cable line Frunzenskiy housing estate All projects Company About the company Career Contacts Jobs Press center Press center Press kit News Reviews Catalogs and reference sheets Electrical substation Construction and reconstruction of substations of all voltage classes. EDS-Engineering has all the necessary permissions to carry out design, construction, commissioning, and commissioning of electrical substations with voltage classes from 10 to 330 kV. More Cable lines Connection to networks and documentation services at all stages EDS-Engineering specialists use modern methods that allow cable laying in trenches, tunnels, channels, and ducts. More Power supply and network connection Connection to networks and documentation services at all stages EDS-Engineering specialists have many years of experience in this field and have repeatedly implemented complex projects to connect residential facilities, retail chains, gas stations, farms, industrial enterprises, warehouses, workshops, and other structures to the power grid. More Industrial solar power station A full cycle of construction of industrial solar power stations EDS-Engineering has been building solar power stations of any complexity. A professional approach to the construction of a power station will ensure the rapid construction and launch of a solar power station, including a high-powered one. More Electrical substations Cable lines Electricity and network connection Industrial solar power station Advantage Over 10 years of experience in the construction of solar power stations and substations 2 500 projects in the field of electricity and energy 3000 units switchboard equipment under the trademark of EDS 500 company professionals of the company, including temporarily attracted to objects 1st place in the rating of designers of SPS according to the GetMarket investment platform More than 900 MW The total capacity of the designed SPS More than 220 MW photovoltaic capacities were built “from scratch” throughout Ukraine 4th place in the rating of general contractors of SPS according to the GetMarket investment platform EDS Engineering projects All projects PS construction The project is being built Construction of substation 330/35 kV "Nadezhdino" The substation will provide power supply to the future Zaporizhzhya wind farm with a capacity of 500 MW, which promises to become the largest in Ukraine. More PS construction The project is completed Reconstruction of electrical substations 150/35/10/3,3 kW «Fedorovka» A set of works on the installation of equipment and specialized software (SCADA system) was completed, which provide the ability to receive and transmit information from the substation (SS) to the control center. More Power Supply and Automation The project is completed THE POWER SUPPLY OF LCD PIXEL Provide supply facility switchboards 0,4 kV individual performance on a qualitative high-voltage equipment Eaton, including one of our flagship sales main switchboard 400A StreamLine. More The project is completed Reconstruction of the cable line «Lider» The length of the route : 2151 m More Cable Lines The project is being built Installation of cable lines for wind farm "Sivash" 150 km of cable lines; 500 km of cable of XLPE; 170 km of fiber-optic communication lines of a high degree of protection. More The project is being built Construction of substation 330/35 kV "Nadezhdino" PS construction The project is completed Reconstruction of electrical substations 150/35/10/3,3 kW «Fedorovka» PS construction The project is completed THE POWER SUPPLY OF LCD PIXEL Power Supply and Automation The project is completed Reconstruction of the cable line «Lider» The project is being built Installation of cable lines for wind farm "Sivash" Cable Lines All projects Projects on the map eds Engineering Objects All objects SP ES Cable line label_connect In the process of implementation Completed Read more Latest news All the news 19/01/2021 High voltage-2. EDS is building an electric substation in Odessa region We are proud to announce the construction of a 110/35 kV high-voltage electric substation "Yuzhne Energy" in Lymanskyi d... PS construction 15/01/2021 Bon voyage! Transformer substations of module series are on the way to the customer The team of the EDS-Power industrial hub shipped two 1600/10 / 0.4 kV packaged transformer substations of the Module ser... Special Services 13/01/2021 Reconstruction of Electrical substation 35/6 KV Maryanskaya is finished We inform you about the next work package completion – the successful implementation of the II stage of reconstruction o... PS construction 11/01/2021 Reconstruction of RP-8 in Donetsk region is completed The EDS team completed the technical reconstruction in the city of Kostyantynivka, Donetsk oblast, at the 6 / 0.4 kV dis... PS construction 04/01/2021 Delivered to the customer another 10-megawatt in Zaporizhia region EDS Group announces the completion of the turnkey construction in the EPC format of an industrial solar power station wi... SES construction 31/12/2020 A bit of magicians. EDS group helped the orphaned children On New Year's Eve, the EDS group made a bit happier children from the social protection institution "Center for Social S... About Company 29/12/2020 Grand opening of a new SPP in Dnipro region This is a 5.25 MW solar power station in the urban-type settlement of Mezhova, Dnipro region, opened on the lands and wi... SES construction 24/11/2020 EDS successfully passed ISO 9001: 2015 supervision audit EDS Holding announces that it has successfully passed the supervision audit for the compliance of quality management wit... About Company 23/11/2020 EDS at INTERFAX-UKRAINE press conference On November 20, Maksym Moldovan, EDS Engineering Chief Engineer, spoke at the "Ways of the development of the solar ener... About Company 29/10/2020 On the SEF & CISOLAR sunny fields We recall the participation of EDS in the SEF & CISOLAR 2020 conference. Vitalii Shakalo, the EDS representative, told t... About Company All the news Directions Electrical substations Cable lines Electricity and network connection Industrial solar power station Specialized services Projects Reconstruction of electrical substations 150/35/10/3,3 kW «Fedorovka» Reconstruction of the cable line «Lider» THE POWER SUPPLY OF LCD PIXEL Construction of substation 330/35 kV "Nadezhdino" Installation of cable lines for wind farm "Sivash" Company About the company Career Contacts Jobs Press center Contacts ul Verkhoyanskaya 49 Dnepropetrovsk, Ukraine, 49049 +38 056 731-95-75 e-mail: info@eds-ltd.com.ua Press center Press kit News Reviews Catalogs and reference sheets Up © 2010-2021 EDS Engineering Consent to the processing of personal data Privacy policy