Monsanto Seeds Ukraine/ Bayer Seeds processing plant Village Pochuyki, Zhytomyr region

Year: 2019
Technologies: IDF, Wi-Fi, Video, Fiber Optics, Control Rooms / Rittal – Siemens –  Cisco – DATWYLER – LAPP Group / Eplan P8/ 3D desing in Autodesk Inventor
Project status: Completed
About the project:

Seeds processing plant IT infrastructure (all technological lines, plant office, warehouse repair rooms)

Design, delivery, mounting, commissioning

Monsanto Seeds Ukraine/ Bayer Seeds processing plant Village Pochuyki, Zhytomyr region

Year: 2019
Technologies: Simatic PCS7 CPU 410-5H/ ASi networks/ Eplan P8/ 3D проектирование в Autodesk Inventor / PCS7
Project status: Completed
About the project:

Seeds processing plant automation  (2-nd technological line – Receiving 05B, Husker 06B, Dryer 08B, Tower 12 Line 1,2)

Design, delivery, mounting, commissioning

ТОО «R.W.S. Logistics» (Kazakhstan, Ekibastuz)

Year: 2017-2018
Technologies: Simatic S7-1200/ Profinet
Project status: Completed
About the project: Positioning system and production material flow  on warehouse of rough wheels on bridge cranes

LLC “Kharkiv Lifting and Transportation Equipment Plant” Kharkiv, Ukraine

Year: 2017-2018
Technologies: contactor-relay circuit
Project status: Completed
About the project: Design, manufacturing and delivery of ACS of drive for bridge crane of common use 30t model No КМ3607.00.000Д

PC «Ukrgasdobytcha» branch Industrial Gas Management «Poltavagasdobytcha»

Year: 2017-2018
Technologies: SIMATIC S7-315/ ETHERNET-PROFINET
Project status: Completed
About the project: Re-equipment of Kotelevske Gas condensate deposit. Technical re-equipment of ACS TP Kolelevske.

Delivery, mounting, comissioning, as-build documentation

LLC «Procter & Gamble Ukraine» Boryspil, Ukraine

Year: 2017-2018
Technologies: RFID
Project status: Completed
About the project: Implementation of accounting system of fixed movable assets

PC «Ukrgasdobytcha» branch Industrial Gas Management «Poltavagasdobytcha

Year: 2017
Technologies: Schneider Electric

CPU SCADAPack 330Е, 314E

radio channel, GPRS, independent power supply of gas well from alternative power source

Project status: Completed
About the project: Technical re-equipmen of well monitoring system, situated on inwash construction of Yablunivske Gas-condensate deposit

Design, delivery, mounting, commissioning, as-build documentation

LLC «Firma Elektroservis», Kharkiv, Ukraine

Year: 2016-2017
Technologies: S7-315-2PN/DP/ Siwarex U/ Industrial Ethernet
Project status: Completed
About the project: The weighing system for a semi-gantry crane type with lifting capacity 2х130t model КПК26000.00.000.Д.

Project, delivery, commissioning

Cargill Egypt Alexandria, Egypt

Year: 2016-2017
Technologies: PCS7 v8.0
Project status: Completed
About the project: ACS TP of oil-extraction plant in Alexandria, Egypt

Design, commissioning

Cargill Liverpool Liverpool, UK

Year: 2016-2017
Technologies: PCS7 v8.0
Project status: Completed
About the project: Refinery upgrade

Design, commissioning

JSC “Zaporozhstal”, Metinvest Group, Zaporizhzhya, Ukraine

Year: 2015-2016
Technologies: OPC server/ WinCC.
Project status: Completed
About the project: Transfer of agglomerate machines No. 2-6 to the combustion of mixed gases

Software development, commissioning

LLC “Kharkiv Lifting and Transportation Equipment Plant” Kharkiv, Ukraine

Year: 2015-2016
Technologies: Simatic S7-300/ Profibus
Project status: Completed
About the project: Automated control system of the electric bridge crane with lifting capacity 20 + 20 tons delivered to the address of OJSC “VMZ” (Vyksa, Russia)

Project / delivery / commissioning

Zamanita LTD Cargill Zambia Lusaka, Zambia

Year: 2016-2018
Technologies: Step 7/WinCC v.7
Project status: Completed
About the project: Automation of soybean extraction plant:

  1. Preparation
  2. Presses
  3. Extraction
  4. Refinery
  5. Cake warehouse

Project, delivery, commissioning

MONSANTO Zhytomyr region, Ukraine

Year: 2015-2018
Technologies: PCS7 v8.1
Project status: Completed
About the project: ACS TP of grains plant

Design, software development, cabinet assembly, delivery, comissioning

Cargill Новоаннинский Novoanninskiy, Russia

Year: 2015-2017
Technologies: PCS7 v8.0
Project status: Completed
About the project: IT infrastructure adjustment and automation of several sections for oil extraction plant in Novoanninskiy, RF:

  1. Ancillary
  2. Extraction
  3. Intake
  4. Pelletizing and offload
  5. Preparation
  6. Boilers

Design, commissioning

'Interbudmontazh' Ashgabat, Turkmenistan

Year: 2016-2017
Technologies: S7-1200/ WinCC ОА /

/ Modbus

Project status: Completed
About the project: Dispatching of drain-communicational tunnel (DCT, г. Ashgabat, Turkmenistan)

Project, delivery, mounting, commissioning

'Interbudmontazh' Ashgabat, Turkmenistan

Year: 2015-2016
Technologies: SIMATIC S7-1500 / ET200MP / Step7 / WinCC / ТР1200 Comfort / Sinamics G120 / Ethernet
Project status: Completed
About the project: Dispatching complex treatment plants, 300

Design, Supply, installation, commissioning