This version of the page http://chnpp.gov.ua/en/home (193.108.226.83) stored by archive.org.ua. It represents a snapshot of the page as of 2020-11-07. The original page over time could change.
SSE Chernobyl NPP
  • RU
  • UA

    Literature 20 October 2020
    Продаж майна / 12.10.2020 12 October 2020
    Продаж майна / 09.09.2020 09 September 2020
    Current Projects 11 June 2020
    Річний план закупівель на 2020 рік 20 May 2020

    Nearest Events

    November 17, 2001 ChNPP was assigned as the operating organization (operator) of Chernobyl NPP’s nuclear installations
    On November 29, 2016, the installation of the NSC Arch into the design position over the Object Shelter was completed

    ChNPP Radiation Monitoring

    
    2020-11-07 04:57:00
    Units - µSv/h
    Temperature: + 7.3 °C
    Relative humidity: 98 %
    Pressure: 744 мм рт.ст.
    Wind speed: 0.4 м/c
    Wind Direction: ЗСЗ - 301°

    Comprehensive radiation monitoring system of Chornobyl Exclusion Zone

    News distribution

    Copyright © 2020 Чорнобильська АЕС. All Rights Reserved.
    Joomla! is Free Software released under the GNU General Public License.