This version of the page http://www.ia.ua/en/projects (193.111.63.86) stored by archive.org.ua. It represents a snapshot of the page as of 2018-07-16. The original page over time could change.
Completed projects - Site 1 from 1 | INFOCOM LTD
  • By region 226
    • Ukraine 149
    • Asia 53
    • Europe 14
    • CIS 9
    • America 1
  • By industry 225
    • Metallurgy 80
    • Engineering industry 26
    • Energy sector 14
    • Automobile industry 9
    • Chemical industry 6
    • Pharmaceutics 5
    • Transport 1
    • Food industry 51
    • Oil and Gas industry 9
    • Other industries 24
The latest project
Read more
LLC «Kharkiv plant of lift-and-carry equipment», Kharkov
Link:
http://www.hzpto.com
Year:
2017
Technologies:
Siemens Simatic S7-300, Sinamics S120 and Sinamics G130, operator's seat Gessmann, network Profibus DP
Project status:
Completed
About the project:
Automated control system of bridge cranes No 225-228 with lifting capacity 50-10 ton
2016
Control system of electric locomotive is based on electric lokomotive EKU-1M that is working in complex of coke-oven battery No 1 of metallurgical plant Arcelor Mittal Temirtau, Kazakhstan.
Read more
2015
Software development for the Soap Transfer System site and commissioning works
2015
Modernization of the control system of the oil extraction plant
2015
Automated system of management accounting
Read more
2009
Controller Simatic S7 programming of overhead equipment of lines KW, WF, EHB, EHB dors, ZP8
2015
Development of the project and software for the project "Semirenkovskiy gas-condensate field construction. Hookup of well № 52 on the Semirenkovskogo gas-condensate field"(Ukraine, Poltava region, Shishatskiy district). The scope of works - ACS of TP, video monitoring, access control.
Read more
2015
Installation of LED-lighting lamp with a capacity of 50W, Zaporozhye (Zaporozhye town council)
Read more
2015
Automated control system of overhead traveling cranes, special bogie truck with carrying capacity of 5+5 tons, Krivoy Rog
Read more
2013-2014
Building of the solar power station with a capacity of 5 MW on the territory of the Trifonovskaya village council, Velikoaleksandrovskiy district, Kherson region
2014-2015
Development and commissioning of the FGS and ESD systems, software development of high-voltage floating converter station. Project, commissioning
2014-2015
Automated control system for turbogenerator TG6,0 / 6,3K2,3 / 0.3 on the LLC "Energy-Novoyavorivsk". Installation supervision, commissioning
2014
Solar power plant with a capacity of 27kW on the facade of an office building for the electric power supply of their own project. Supply, installation, commissioning
2014
The solar power plant with a capacity of 100kW for electric power supply of own needs, adjustment
2013-2014
Building of the solar power station with a capacity of 5 MW on the territory of the Trifonovka village council, Velikoaleksandrovskiy district, Kherson region
2013-2015
Design, supply, installation, commissioning.
Read more
2013-2015
Design of RIO3 control cabinet on the basis of Quantum controllers with I/O module set for connection of digital and analog signals from machines.
Read more
2015
Modernization of control system for multifunctional hydraulic truck tipper
Read more
2015
Modernization of the flat storage cotrol system
Read more
2015
Modernization of the control system for oil extraction shop
Read more
2014
Tracking system for incoming materials and outgoing products is intended for transportation control and tracking of incoming auto transport with raw materials and outgoing auto transport with finished products.
Read more
2014-2015
Reconstruction of the the sunflower seeds processing line with increasing productivity up to 1700 tons per day
Read more
2015
Oil site PCS7 system update
Read more
2015
ACS for rail car raw material unload with hot flush
Read more
2014
Development of software PLC, HMI, VFD and start-up and commissioning of 4 cranes of load-carrying capacity up to 120 tons
Read more
2013-2014
Laying and connection of 0,4 kV cable to the water and wastewater treatment facilities
Read more
2014
Branch «Steppe elevator Balakleya» "АТ Cargill» LLC (town Savintsy, Balakleya district, Kharkiv region, Ukraine 
Read more
2014
Modernization of the overhead crane № 35 of the pipe-drawing shop via switching the lifting and overhead crane mechanism to the frequency regulation, PJSC «CENTRAVIS PRODUCTION UKRAINE», Nikopol
Read more
2014
«Modernization of ACS of extractors А201.1 and А201.2», PJSC “Zaporizhzhya oil and fat plant”
Read more
2014
ACS of TP of the feeding, transportation and removal of semi-finished products on the production line Burde in the tube drawing shop on PJSC “Centravis Production Ukraine”
Read more
2014
Replacement of equipment in the extraction electric section at the production structure preparation shop at the CJSC „Zaporozhye oil and fat plant”.
Read more
2014
Modernization of elevator PLC equipment
Read more
2014
ACS of TP of vacuum arc furnace “Nerta LTD”, Zaporozhye, Ukraine.
Read more
2014
Only reliable world wide known manufacturers as SIEMENS, PHOENIX CONTACT, RITTAL were used while designing. Design documentation was developed indesign environments EPLAN Electric P8, AutoCAD, Microsoft WORD and Microsoft EXCEL.
Read more
2014
ACS of TP of paper making machine №2
Read more
2013-2014
ACS of TP, electric power plant, control and measurement equipment.
Read more
2013-2014
ACS of TP, electric power plant, control and measurement equipment and lighting.
Read more
2014
ACS of TP of paper making machine №2
Read more
2013-2014
ACS of TP, measurement and control equipment
Read more
2014
ACS of section №3 of liquid medicinal products in bottles. Shop №1. Reconstuction of СІРs system.
Read more
2013
Modernization of Trim emission ACS of air recirculation on the utilization section.
Read more
2013
Modernization of mechanisms for flap door control
2013
Modernization of the control system SVP №83
Read more
2013
The monitoring system of upper water treatment facilities. Residence "Crimean breeze."
Read more
2012
Feasibility study for automatic transport system
2011
Integration of control system of raw material feed to silo plastic film №5 to an existing control system of material feed to silo. Project, procurement, assembly, adjustment
Read more
2011
Service of Siemens equipment
Read more
2011
Modernization of control panel SPS (sewage pumping stations) and SWPS (storm water pumping station) of control system with integration of data into an existing visualisation system. Design, supply, installation and commissioning.
Read more
2011
ACS TP, despatching, MCC energy distribution for polycrystalline silicon production. Project, delivery, adjustment
Read more
2011
ACS TP of despatching and MCC energy distribution for hydrogen station. Project, delivery, adjustment