This version of the page http://www.ia.ua/de/projects-deu (0.0.0.0) stored by archive.org.ua. It represents a snapshot of the page as of 2017-10-28. The original page over time could change.
Projekte - Site 1 from 1 | INFOCOM LTD
  • Nach Gebieten 216
    • Ukraine 141
    • Asien 52
    • CIS 9
    • Europa 13
    • Amerika 1
  • Nach Branchen 217
    • Nahrungsmittelindustrie 49
    • Andere 24
    • Automobilindustrie 9
    • Energetik 8
    • Öl-und Gasindustrie 8
    • Chemieindustrie 6
    • Pharmazeutik 5
    • Transportbranche 1
    • Metallurgie 80
    • Maschinenbau 27
Das letzte Projekt
Weiterlesen
LLC «Kharkov plant of lift-and-carry equipment», Kharkov
Webseite:
http://www.hzpto.com
das Verwirklichungsjahr:
2017
Die Technologien:
Siemens Simatic S7-300, Sinamics S120 and Sinamics G130, operator's seat Gessmann, network Profibus DP
Projektphase:
Completed
Über das Projekt:
Automation control system of bridge cranes No225-228 with carrying capacity 50-10 ton
2016
Control system of electric locomotive is based on electric lokomotive EKU-1M that is working in complex of coke-oven battery No 1 of metallurgical plant Arcelor Mittal Temirtau, Kazakhstan.
Weiterlesen
2015
Software development for the Soap Transfer System site and commissioning works
2015
Modernization of the control system of the oil extraction plant 
2015
Automated system of management accounting
Weiterlesen
2009
Controller Simatic S7 programming of overhead equipment of lines KW, WF, EHB, EHB dors, ZP8
2015
Automated control system of overhead traveling cranes, special bogie truck with carrying capacity of 5+5 tons, Krivoy Rog
Weiterlesen
2013-2015
Die Projektierung des Elektrosteuerschranks RIO3 auf der Basis von Quantum-Steuereinheiten mit dem Set von Eingangs-, und Ausgangsmoduln für die Einschaltung von Digitalsignalen und Analogsignalen aus den Anlagen.
Weiterlesen
2013-2015
Projekt, Lieferung, Montage, Inbetriebnahme.
Weiterlesen
2015
Die Modernisierung des Steuerungssystems für die hydraulische Mehrzweckautokippvorrichtung
Weiterlesen
2015
Die Modernisierung des Steuerungssystems für Bodenlager
Weiterlesen
2015
Die Modernizierung des Steuerungsystem für die Ölextraktionsabteilung
Weiterlesen
2014
Das Tracking-System für die eingehenden Rohstoffe und die Ausgangsproduktion dient für die Transportsteuerung und fürs Tracking vom einkommenden Fahrzeug mit Rohstoffe und vom Ausgangsfahrzeug mit Fertigerzeugnissen.
Weiterlesen
2014-2015
Reconstruction of the the sunflower seeds processing line with increasing productivity up to 1700 tons per day
Weiterlesen
2015
Oil site PCS7 system update
Weiterlesen
2015
ACS for rail car raw material unload with hot flush using
Weiterlesen
2014
Development of software PLC, HMI, VFD and start-up and commissioning of 4 cranes of load-carrying capacity up to 120 tons
Weiterlesen
2013-2014
Laying and connection of 0,4 kV cable to the water and wastewater treatment facilities
Weiterlesen
2014
Branch «Steppe elevator Balakleya» "АТ Cargill» LLC (town Savintsy, Balakleya district, Kharkiv region, Ukraine)  
Weiterlesen
2014
Modernization of the overhead crane № 35 of the pipe-drawing shop via switching the lifting and overhead crane mechanism to the frequency regulation, PJSC «CENTRAVIS PRODUCTION UKRAINE», Nikopol
Weiterlesen
2014
«Modernization of ACS of extractors А201.1 and А201.2», PJSC “Zaporizhzhya oil and fat plant”
Weiterlesen
2014
Modernization of the control system of feeding, transportation and removal of semi-finished products on the production line Burde in the tube drawing shop on PJSC «Centravis Production Ukraine».
Weiterlesen
2014
Replacement of equipment in the extraction electric section at the sunflower seed processing shop at the CJSC „Zaporozhye oil and fat plant".
Weiterlesen
2014
Development of design and software documentation for modernization of elevator PLC equipment.
Weiterlesen
2014
Only reliable and worldwide known manufacturers as SIEMENS, PHOENIX CONTACT, RITTAL were used while designing. Design documentation was developed in design environments EPLAN Electric P8, AutoCAD, Microsoft WORD and Microsoft EXCEL.
Weiterlesen
2014
ACS of TP of paper making machine №2
Weiterlesen
2013-2014
ACS of TP, electric power plant, control and measurement equipment.
Weiterlesen
2013-2014
ACS of TP, electric power plant, control and measurement equipment and lighting.
Weiterlesen
2014
ACS of TP of paper making machine №2
Weiterlesen
2014
Development of the control program for borehole №3, commissioning works, including integration into the existing control system for boreholes №1 and №2.
Weiterlesen
2013-2014
ACS of TP, measurement and control equipment
Weiterlesen
2014
ACS of section №3 of liquid medicinal products in bottles. Shop №1. Reconstuction of СІРs system.
Weiterlesen
2013
Modernization of the control system SVP №83
Weiterlesen
2012
Feasibility study for automatic transport system
2011
Integration of control system of raw material feed to silo plastic film №5 to an existing control system of material feed to silo. Project, procurement, assembly, adjustment
Weiterlesen
2011
Service of Siemens equipment
Weiterlesen
2011
Modernization of control panel SPS (sewage pumping stations) and SWPS (storm water pumping station) of control system with integration of data into an existing visualisation system. Design, supply, installation and commissioning.
Weiterlesen
2011
ACS TP, despatching, MCC energy distribution for polycrystalline silicon production. Project, delivery, adjustment
Weiterlesen
2011
ACS TP of despatching and MCC energy distribution for hydrogen station. Project, delivery, adjustment