Below is the text of the page https://www.lnkenergy.com/eng/ stored 2017-03-12 by archive.org.ua. The original page over time could change. View as original html

LNK energy

[/eng/] Home About us Contacts Feedback Callback Partners Gallery Articles Contacts Welcome to the LNK website On April 1, 2012 LNK LLC put into operation Ukraine's first biogas power plant on landfill gas at MSWL (Municipal solid waste landfill) No. 5 in Pidhirtsi, Obukhiv district of Kyiv region). Installed capacity of phase one power plant is 885 kW. The second biogas plant was put into operation by LLC LNK at BoryspilMSWL in Glyboke,Boryspil district of Kyiv region onJune 4, 2013 with installed capacity of 1063 kW. The second phase ofthe biogaspower plantatMSWL No.5(Pidhirtsi, Obukhiv district of Kyivregion)installed capacityof 1063kWwas put into operationby LLC LNK on November 20, 2013. As at 1 February 2014: The power generated by allLNK LLC’s biogas plants is enough to supply electricity to 8.5 thousand households a year. Thanks to the work of biogas plants, LNKLLC could prevent greenhouse gas (landfillgas)emission: near Pidhirtsi in Obukhiv district, Kyiv region over 6.5 million cubic meters, which is equivalent to greenhouse gas emission reduction of 48.3 thousand tons CO2 eq. near Glyboke, Boryspil district of Kyiv region over 3.0 million cubic meters, which is equivalent to greenhouse gas emission reduction of 18.3 thousand tons CO2 eq. total in Kyiv region more than 9.6 million cubic meters, which is equivalent to greenhouse gas emission reduction of 66.7 thousand tons CO2 eq. On February 6, 2014 LNK LLC commenced construction works for the speedy commissioning of a biogas power plant at the Brovary MSWlandfill (Rozhivka, Brovarskiy district in Kyiv region) and the new power facility at MSWL No. 5. Through this LNK LLC plans to bring the total installed capacity of all these biogas plants to 4074 kWby the end of the first half of 2014. LNK LLC has already made an advance purchase of two new generating units to the capacity of 1,063 kW to be installed at biogas power plants in Mykolaiv and Zhytomyr regions. Power plant construction is scheduled to begin in II quarter 2014. The GE Jenbacherplant in Austria has started production of generating modules. Commissioning of biogas plants in Mykolayiv and Zhytomyr regions will bring the total capacity of LNK LLC’s power plants to 6.2 MW by the end of 2014. Our facilities Landfill No.5 Ukraine's first and largest biogas power plant functions at the Municipal Solid Waste Landfill number 5 (Pidhirtsi in Obukhiv district, Kyiv region) with two phases of the biogas plant already commissioned. More Boryspil Landfill From 4June 2013 a biogas power plant functionsat the Municipal Solid Waste Landfill, located on the road to Glybokein Boryspil district of Kyiv region... More Brovary Landfill At the MSW Landfill, located on the road to Rozhivka in Brovarskiy district of Kyiv region, works have started on drilling the test wells... More View all objects Latest news 12 ноя 2014 Member of Ukrainian Renewable Energy Association LNK was accepted as a member of Ukrainian Renewable Energy Association. More 01 ноя 2014 Regional workshop LNK participated in regional workshop Promoting Green Economy in GUAM countries... More View all news Company’s Goals MSW landfill degassing Electricity generation Increased fire safety Jobs creation Research and Development View all company goals Компания ЛНК About us Contacts Feedback Callback News The opening of the Pidhirtsi Biogas Facility Kiselyova defended the investment project LNK is mentioned in the EPA Annual Report LLC is accredited as a consulting organization Articles and publications Ambassador Tefft's speach on landfill-based Methane (Biogas) Facility Opening Future Article LFG Energy Project Development Handbook Ecological power plant jpened in Boryspil © 2012 LNK