About Us |
"MZMK" is one of the leaders in the production of construction steel structures and tanks. The following operations make a list of works carried out by the plant:
|
Rates of exchange | 13.07.2015 | |||
10 | російських рублів | 3.87 | 0.03 | |
100 | ЄВРО | 2451.36 | 36.26 | |
100 | доларів США | 2191.65 | 6.83 | |
29.08.2013
As of today 1,200 tons of steel structures for the construction of new safe confinement of the Chernobyl nuclear power plant have been shipped. All terms on the contract are met, no reclamations.
19.08.2013
The modernization of the gas-plasma facility, released in 2011, has been carried out for the purpose of expansion of production capacity.
22.04.2013
Shipment of tanks to Kazakhstan has been completed. The contract has been executed on time and without reclamations from the customer.
All news
Rolled Tanks – 87,000 tons
Layer Installed Tanks – 82,000 tons
Steel Structures – 77,700 tons
Liepaja Terminal
Liepaja Fuel Terminal, LatviaOne tank with volume of 3000...
Read more...
|
Delta Wilmar
Singapore, South Port Project, OdessaVertical steel...
Read more...
|
EMZ
Enakiyevo Metallurgical Works (EMZ),...
Read more...
|