Metinvest Metinvest sales

Mining division

  • Ingulets GOK
  • Nothern GOK
  • Central GOK
  • Komsomolskoye MC
  • Krasnodon Coal Company
  • United Coal Company

Metallurgical division

  • Azovstal Iron and Steel Work
  • Ilyich Iron and Steel Works
  • Yenakiieve Steel
  • Khartsyzsk pipe plant
  • Metinvest-Resource
  • Avdiivka Coke Plant
  • Inkor Chemicals
  • Promet Steel
  • Ferriera Valsider
  • Metinvest Trametal
  • Spartan UK

AZOVSTAL IRON & STEEL WORKS
  • рус
  • укр
  • eng
Results
 

Energy saving

Development and implementation of resource-efficient processes and equipment, organizational and technological actions intended for efficient management of raw materials and energy and for reduction of energy-intensity of metallurgical products is one of the most essential tasks of Azovstal's power engineers.

The following directions should be emphasizes in energy efficiency activity:

  • fulfillment of production program using the optimal number of metallurgical and energy units;
  • implementation of energy efficient technologies and equipment in repair and maintenance;
  • use of new materials and alternative fuels;
  • company-wide adoption of control and accounting systems intended for optimization of energy consumption;
  • identification of non-rational uses of fuel and energy and development and implementation of corrective actions;
  • reduction of specific rates of energy consumption;
  • energy-intensity: efficient use of energy.

Completed projects

  • automatic commercial and technical accounting system for electricity, natural gas, industrial and drinking water;
  • automatic accounting system for sea water flow at pump houses;
  • new air separation unit ACU-60 was brought into operation;
  • new blast furnace gas pipeline was brought into operation at Thermal Power plant;
  • the external energy audit of Azovstal's energy facilities was performed and recommendations for revamping were provided;
  • condensate drains were installed on main steam pipelines;
  • improvement in heating system at the rotary-hearth kiln No. 1 (Limekiln Shop);
  • change in metal heating algorithm at the ladle furnaces No. 1 and No. 2 (BOF Shop);
  • introduction of improved system and charging mode of blast furnaces equipped with tray-type charging devices using dialog evaluation systems of burden distribution at the top;
  • equipping of BF coke vibration skins with new type screens;
  • rational utilization of re-heating furnaces at Rail and Structural Mill in terms of rolling with billet heating in the re-heating furnace No. 3 and No. 4;
  • installation of partitions in the bottom soaking zone of re-heating furnaces No. 3 and No. 4 at Plate Mill;
  • isolation of longitudinal skid pipes at the furnaces 1-4 and change in burner arrangement at the re-heating furnace No. 3 (Rail and Structural Mill).

              PJSC "AZOVSTAL IRON & STEEL WORKS" policy in the field of energy management

              News
              18 August 2015 Metinvest supplies rails for new railway track in Cuba
              15 June 2015 Mariupol metallurgical plants resume production after restoration of gas supplies
              28 May 2015 Green City: Special sustainable urban development funds need to be created
              METINVEST
              18 August 2015 Metinvest supplies rails for new railway track in Cuba
              17 August 2015 Yuriy Ryzhenkov: "Physics of charity: The fulcrum is hope and the lever is our help"
              10 August 2015 Avdiivka Coke restores power supply and resumes normal operations
              • Code of ethics2013