This version of the page http://www.energoatom.kiev.ua/en/nuclear_repair (0.0.0.0) stored by archive.org.ua. It represents a snapshot of the page as of 2011-06-07. The original page over time could change.
NNEGC "Energoatom" / Separated subdivisions
Íàö³îíàëüíà àòîìíà åíåðãîãåíåðóþ÷à êîìïàí³ÿ    
 
      
NNEGC “Energoatom”   Separated subdivisions   Tenders   Photo Gallery  
Main :: Separated subdivisions :: Separated Subdivision “AtomRemontService”   Ukr  Rus  Eng  

“AtomRemontServis” (ARS), a separated entity of the NNEGC «Energoatom», was established in early 2001. The strategic purpose of ARS activity is to carry out complex and non-conventional repairs at Ukrainian NPPs in safe and effective manner, in particular, with installation, repair, rehabilitation and modernization of equipment at nuclear power units. In addition, ARS participates in implementation of international projects at Chernobyl NPP.

Comprehensive engineering and technological support of maintenance outages helps reduce maintenance work duration while implementation of modern diagnostic systems and technologies promotes quality improvement of the maintenance work. ARS has a training facility for personnel qualification upgrading and retraining.

To ensure technical and informational support to organizational structures of emergency response systems of NNEGC «Energoatom», SE “AtomRemontService” employs the Off-Site Emergency Response Center. SE ARS specialists carry out activities on completion of this facility and ensure operability and sustainable preparedness of the Off-Site Emergency Response Center facilities, communication and alarm aids to manage emergency response activities.

In May 2006 SE ARS was awarded a certificate that confirms compliance of its quality management system with ISO 9001. ARS annually confirms during the «TÜV SUD» audits the compliance of its quality management system with ISO 9001 requirements. 

AtomRemontService”  holds licenses for the activities as follows:

- for construction;

- for the right to use sources of ionizing radiation;

- for design of engineering tools of protection of nuclear installations, nuclear materials, radioactive waste, other sources of ionizing radiation

- for installation, assembling, alignment, repair and maintenance of engineering tools of protection of nuclear installations, nuclear materials, radioactive waste, other sources of ionizing radiation;

- for design, installation, maintenance of fire protection tools;

- for implementation of activities on reprocessing, storage and disposal of radioactive waste (design and construction of facilities, design and manufacturing of equipment intended for     radioactive waste management), etc.


LATEST NEWS

13.10.2010 International conference “Ukrainian Nuclear Forum” Association
10.03.2010 The State Enterprise National Nuclear Energy Generating Company “Energoatom” is going to procure nuclear materials (Natural Uranium Hexafluoride and Enriched Uranium Hexafluoride) in the amount necessary for reloading two VVER-1000 units in 2011 and for annual reload of three VVER-1000 power units for the period 2012-2015
23.01.2007 TVEL and Energoatom signed the contract for nuclear fuel supply
14.11.2006 On November 13, Nuclear Power Plants have produced 266.39 million KWh of electricity
13.11.2006 On November 12, Nuclear Power Plants have produced 263.84 million KWh of electricity
10.11.2006 NNEGC “Energoatom” extended Tender Bid submission period in Tender for Procurement of Uranium Products untill November, 24
10.11.2006 On November 9, Nuclear Power Plants have produced 242.23 million KWh of electricity
09.11.2006 Andriy Derkach, President of SE NNEGC “Energoatom” met with Mrs. Laura Reinila, Ambassador Extraordinary and Plenipotentiary of Finland in Ukraine
09.11.2006 On November 8, Nuclear Power Plants have produced 242.70 million KWh of electricity
08.11.2006 On November 7, Nuclear Power Plants have produced 242.89 million KWh of electricity
07.11.2006 On November 6, Nuclear Power Plants have produced 263.61 million KWh of electricity
06.11.2006 On November 5, Nuclear Power Plants have produced 257.66 million KWh of electricity
03.11.2006 On November 2, Nuclear Power Plants have produced 246.86 million KWh of electricity
02.11.2006 On November 1, Nuclear Power Plants have produced 253.78 million KWh of electricity
01.11.2006 On October 31, Nuclear Power Plants have produced 257.89 million KWh of electricity

System login

Site map Search Subscribe Forum Contacts
© ÍÀÝÊ "Ýíåðãîàòîì". All right reserved. 
Created by FinportTechnologies Inc. Hosted by:Interactive Systems Ltd.